FEATURES:Oceanfront and oceanside condominiums. Convenient beach access, outside shower, outdoor pools with changing rooms, tennis courts, basketball goal, elevators in A, D, & E buildings, washers/dryers by pool between B & C, outdoor grills. Two parking spaces per unit. No boats or trailers. No pets.
3 BR, 2 B. Q * D * Trundle daybed. Island Club linens provided. Dishwasher, 2 cable TVs, wireless high speed Internet access, ceiling fans. Coin-operated washer/dryer on premises. Well equipped kitchen. Short walk to beach access and both swimming pools. Private balcony with porch furniture and good oceanview. No smoking. No pets.
The tennis courts are currently under repair by the HOA with no ETA for a completion date, at this time.
At this time the pool area is closed until further notice based on the requirements of the governor’s executive order and the state interim guidelines for the reopening of public pools in North Carolina.
Please note this property may be located in an area that is scheduled for Beach Renourishment during the months of February, March and April. This section of beach is estimated to be nourished between Feb 1 - Feb 21st
Question & Answer (Q & A) from Carteret County Shore Protection Office Post-Florence Beach Renourishment Project
Q: WILL THE CONSTRUCTION EQUIPMENT, NOISE, AND BEACH NOURISHMENT PROCESS IN GENERAL CAUSE ANY MAJOR DISRUPTIONS DURING OUR VISIT TO THE BEACH?
A - LIKELY NOT. The bulk of the bulldozers, lights, surveying equipment, etc. is confined to the narrow area where the slurry of sand and water is being pumped directly on to the beach. The pipe is extended as the nourishment fill progresses further down the beach, and will subsequently be dissembled and moved throughout the project. Also, sand bridges will be built over the pipeline stretch at a minimum of every few 100 feet and at every regional beach access point to enable residents and visitors to access the water. Thus, any direct disruption will only be for a day or two. Beach nourishment is a "24-7" operation (24 hours a day - seven days a week), so progress should be very quick. For the most updated timeline and completion dates please click the following link: http://www.carteretcountync.gov/827/Florence-Renourishment-Project-2021